These photos are not in chronological order but this first photo is the last one taken
the new gas stove ready to be hooked up
![]() |
Ready for drawer pulls |
![]() |
Painted the carcass |
![]() |
Ended up painting the white plug to match the cupboard |
![]() |
Adding the shaker front trim |
![]() |
The dishwasher used to be here so we gained an entire cabinet |
![]() |
Finished utility cupboard formerly an open coat closet and before that NOTHING dead useless space |
![]() |
utility cupboard |
![]() |
What is with all of this chaos?! |
![]() |
Is supper ready? |
![]() |
Ready for the pulls |
![]() |
Old white stove sold for $100 |
![]() |
Ready for pulls |
![]() |
top drawer |
![]() |
second drawer |
![]() |
food storage containers |
![]() |
most important popcorn prep, panini maker and waffle maker |
![]() |
Kathy created spice jars with blackboard paint lids |
![]() |
2 drawers of spices |
![]() |
coffee and tea drawer |
![]() |
baking pans |
![]() |
dead corner filled with an angled divided box for cookie sheets, pizza stone and muffin tins |
![]() |
reorganized under the sink |
![]() |
the shaker look complete except for the pulls |
![]() |
new gas stove pushed in but not hooked up yet |
![]() |
pulls installed and cabinets ready for touch ups |
![]() |
obviously need to reinstall magnetic closures |
![]() |
our new lovely dishwasher |
![]() |
attaching drawer fronts |
![]() |
love the full extension drawer glides |
![]() |
Kathy is hanging on to her butcher block top |
![]() |
Before the new paint |
![]() |
secret door with no pull |
![]() |
applying the shaker trim |
![]() |
closer look at the trim |
![]() |
worked bottom to top used paint stir sticks for spacers |
![]() |
finished butcher block with 3 coats satin varathane |
![]() |
always a work in progress |
![]() |
removed all drawers to work on them |
![]() |
getting things back in place |
![]() |
Monty hope I get done soon |
![]() |
the new dishwasher was too high so we raised the entire counter to add 1x4's |
![]() |
then the dishwasher will fit but the sink needed to come out first |
![]() |
and the floor heat vent and sink vent needed to be moved |
![]() |
chaos in the dining room |
![]() |
chaos in the living room |
![]() |
by this time we know the dishwasher will fit |
![]() |
raising the 3 part counter worked after we removed all the ceramic tiles yay new tiles! |
![]() |
we could only have a gas stove if we had 18" clearance. Some cupboards had to be butchered |
![]() |
the width is fine the height not so much |
![]() |
covered up the heat vent |
![]() |
now how to cut these cupboards? |
![]() |
removed the stiles and replaced them later |
![]() |
where do we get meals prepped? |
![]() |
note the chisel |
![]() |
the microwave will go here and free up counter space |
![]() |
doors need to come off first |
![]() |
Kathy is happy with the new location for the microwave |
![]() |
now the mic will fit |
![]() |
testing yes it's a good location |
![]() |
small subway tiles suit us |
![]() |
chaos is part of the job |
![]() |
gluing tiles down |
![]() |
I rented a power tile cutter and loved using it |
![]() |
a ledger board helps for first row |
![]() |
like a puzzle |
![]() |
only one way to get into the corner |
![]() |
another angle |
![]() |
time to grout and seal |
![]() |
yeh dishwasher is in and we did not need the plumber |
![]() |
at this point we decided we needed a stainless fan instead of the white one |
![]() |
stainless fan installed no electrician required |
![]() |
now we just need the new stove |
![]() |
deciding paint colors with a swatch |
![]() |
deciding where to put stuff |
No comments:
Post a Comment