These photos are not in chronological order but this first photo is the last one taken
the new gas stove ready to be hooked up
Ready for drawer pulls |
Painted the carcass |
Ended up painting the white plug to match the cupboard |
Adding the shaker front trim |
The dishwasher used to be here so we gained an entire cabinet |
Finished utility cupboard formerly an open coat closet and before that NOTHING dead useless space |
utility cupboard |
What is with all of this chaos?! |
Is supper ready? |
Ready for the pulls |
Old white stove sold for $100 |
Ready for pulls |
top drawer |
second drawer |
food storage containers |
most important popcorn prep, panini maker and waffle maker |
Kathy created spice jars with blackboard paint lids |
2 drawers of spices |
coffee and tea drawer |
baking pans |
dead corner filled with an angled divided box for cookie sheets, pizza stone and muffin tins |
reorganized under the sink |
the shaker look complete except for the pulls |
new gas stove pushed in but not hooked up yet |
pulls installed and cabinets ready for touch ups |
obviously need to reinstall magnetic closures |
our new lovely dishwasher |
attaching drawer fronts |
love the full extension drawer glides |
Kathy is hanging on to her butcher block top |
Before the new paint |
secret door with no pull |
applying the shaker trim |
closer look at the trim |
worked bottom to top used paint stir sticks for spacers |
finished butcher block with 3 coats satin varathane |
always a work in progress |
removed all drawers to work on them |
getting things back in place |
Monty hope I get done soon |
the new dishwasher was too high so we raised the entire counter to add 1x4's |
then the dishwasher will fit but the sink needed to come out first |
and the floor heat vent and sink vent needed to be moved |
chaos in the dining room |
chaos in the living room |
by this time we know the dishwasher will fit |
raising the 3 part counter worked after we removed all the ceramic tiles yay new tiles! |
we could only have a gas stove if we had 18" clearance. Some cupboards had to be butchered |
the width is fine the height not so much |
covered up the heat vent |
now how to cut these cupboards? |
removed the stiles and replaced them later |
where do we get meals prepped? |
note the chisel |
the microwave will go here and free up counter space |
doors need to come off first |
Kathy is happy with the new location for the microwave |
now the mic will fit |
testing yes it's a good location |
small subway tiles suit us |
chaos is part of the job |
gluing tiles down |
I rented a power tile cutter and loved using it |
a ledger board helps for first row |
like a puzzle |
only one way to get into the corner |
another angle |
time to grout and seal |
yeh dishwasher is in and we did not need the plumber |
at this point we decided we needed a stainless fan instead of the white one |
stainless fan installed no electrician required |
now we just need the new stove |
deciding paint colors with a swatch |
deciding where to put stuff |
No comments:
Post a Comment