Kitchen renovation November 2020 year of the COVID
These photos are not in chronological order but this first photo is the last one taken
the new gas stove ready to be hooked up
Ready for drawer pulls |
Painted the carcass |
Ended up painting the white plug to match the cupboard |
Adding the shaker front trim |
The dishwasher used to be here so we gained an entire cabinet |
Finished utility cupboard formerly an open coat closet and before that NOTHING dead useless space |
utility cupboard |
What is with all of this chaos?! |
Is supper ready? |
Ready for the pulls |
Old white stove sold for $100 |
Ready for pulls |
top drawer |
second drawer |
food storage containers |
most important popcorn prep, panini maker and waffle maker |
Kathy created spice jars with blackboard paint lids |
2 drawers of spices |
coffee and tea drawer |
baking pans |
dead corner filled with an angled divided box for cookie sheets, pizza stone and muffin tins |
reorganized under the sink |
the shaker look complete except for the pulls |
new gas stove pushed in but not hooked up yet |
pulls installed and cabinets ready for touch ups |
obviously need to reinstall magnetic closures |
our new lovely dishwasher |
attaching drawer fronts |
love the full extension drawer glides |
Kathy is hanging on to her butcher block top |
Before the new paint |
secret door with no pull |
applying the shaker trim |
closer look at the trim |
worked bottom to top used paint stir sticks for spacers |
finished butcher block with 3 coats satin varathane |
always a work in progress |
removed all drawers to work on them |
getting things back in place |
Monty hope I get done soon |
the new dishwasher was too high so we raised the entire counter to add 1x4's |
then the dishwasher will fit but the sink needed to come out first |
and the floor heat vent and sink vent needed to be moved |
chaos in the dining room |
chaos in the living room |
by this time we know the dishwasher will fit |
raising the 3 part counter worked after we removed all the ceramic tiles yay new tiles! |
we could only have a gas stove if we had 18" clearance. Some cupboards had to be butchered |
the width is fine the height not so much |
covered up the heat vent |
now how to cut these cupboards? |
removed the stiles and replaced them later |
where do we get meals prepped? |
note the chisel |
the microwave will go here and free up counter space |
doors need to come off first |
Kathy is happy with the new location for the microwave |
now the mic will fit |
testing yes it's a good location |
small subway tiles suit us |
chaos is part of the job |
gluing tiles down |
I rented a power tile cutter and loved using it |
a ledger board helps for first row |
like a puzzle |
only one way to get into the corner |
another angle |
time to grout and seal |
yeh dishwasher is in and we did not need the plumber |
at this point we decided we needed a stainless fan instead of the white one |
stainless fan installed no electrician required |
now we just need the new stove |
deciding paint colors with a swatch |
deciding where to put stuff |